The process for rehabilitating underground service connections is an innovative service offered by Kettler. The company provides utility companies with the ability to restore defective or damaged service connections to operational condition directly through the manhole cover. Compared to existing methods for repairing or maintaining service connections, this process differs in four key areas:
- Minimal intervention directly through the manhole cover
- no road damage
- no head hole
- quick and clean
- What is a built-in fixture restoration?
A manhole assembly rehabilitation is a minimally invasive procedure performed directly through the manhole cover. In this process, defective manhole assemblies are restored to working order or replaced with new ones.
Procedural Steps
Vacuuming creates an annular space extending up to the top of the fitting. Next, an assessment of the actual condition of the connection between the installation kit and the fitting is performed. Depending on its condition, the defective installation kit is either repaired or completely replaced. Finally, the annular space is filled with a special liquid grout.
This method is used in underground pipeline construction for installation kits mounted on heavy-duty fittings. The manhole cover should have a clear diameter of at least 100 mm. This allows for the subsequent installation and removal, as well as the proper assembly of all components.
Are you interested?
A completed questionnaire is required as preliminary information. This provides details about the installation kit, the fittings, and the installation conditions, to the extent that they are known. It would also be helpful to include photos of the visible portion inside the manhole cover, as well as the local conditions.
Prior to the construction work, the client must obtain the necessary traffic control orders (VAO) and the corresponding excavation permits.
During the construction work, the client must arrange for the necessary traffic safety measures and provide a local guide familiar with the area. The average duration of a rehabilitation project is approximately 2.5 hours.